Quick Answer: A 1250 kVA Cummins generator set delivers 1250 kVA of apparent power, which is 1000 kW at 0.8 pf, and it suits industrial plants, hospitals, telecom hubs and data rooms with heavy motor or rectifier load. Tesla Power quotes both figures with the power factor so buyers compare like with like.
- Read 1250 kVA as apparent power and 1000 kW at 0.8 pf as the usable real power.
- Check the site’s actual power factor before relying on the kW figure.
- Size cables and breakers from the current at the site voltage.
- Confirm the alternator frame against the largest motor start.
What does a 1250 kVA Cummins generator set deliver?
A 1250 kVA Cummins generator set delivers 1250 kVA of apparent power and 1000 kW at 0.8 pf of real power, from a large-frame Cummins engine driving a brushless alternator. The kVA figure describes the current the machine can supply; the kW figure describes how much of that current the load can convert into work.
The distinction matters on any site with motors, transformers or rectifiers, because those loads draw current that does not all become useful output. A set quoted in kVA tells the buyer how much equipment can be connected; a set quoted in kW tells the buyer how much work can be done. Both are true, and neither is complete without the power factor.
Tesla Power states both numbers with the power factor on the data sheet, because a buyer comparing a kVA quotation with a kW quotation from another supplier is often comparing the same machine described two different ways.
How many kW is 1250 kVA?
1250 kVA is 1000 kW at 0.8 pf, which is the convention used for generator sizing. If the site’s load runs at a lower power factor, the usable kW falls while the kVA stays the same.
The relationship is direct: real power equals apparent power multiplied by the power factor. At 0.8 pf the ratio is four fifths, so every 1250 kVA of alternator capacity supports 1000 kW of load. At a lower power factor the same alternator supports less real power, and the buyer who sized from the kVA figure alone will find the set short of capacity.
That is why the load list should record the power factor of the major loads rather than a single assumed number. Tesla Power asks for it whenever the site has a large motor population, a welding shop or a bank of rectifiers, since those are the loads that pull the site power factor below the sizing convention.
Why do suppliers quote kVA and buyers think in kW?
Suppliers quote kVA because the alternator, the cables and the breaker are all limited by current, and current follows apparent power. Buyers think in kW because their equipment nameplates and their electricity bills are stated in kW.
The two viewpoints meet at the power factor, and the mismatch causes more specification errors than any other single item in generator procurement. A buyer who asks for a 1000 kW set may receive a machine rated at 1250 kVA at 0.8 pf, while a buyer who asks for 1250 kVA may expect 1250 kW of usable output and be disappointed.
The practical fix is to write both figures into the enquiry and to state the assumed power factor. Tesla Power quotes in kVA and kW together for that reason, and the quotation notes the power factor the conversion assumes.
What current does it deliver at each voltage?
At full apparent power the set delivers about 1,800 A per phase at 400 V, about 1,740 A at 415 V, about 1,900 A at 380 V and about 1,500 A at 480 V. Those currents size the cable, the breaker and the busbar, and they are the numbers the electrical contractor needs first.
Current equals apparent power divided by the square root of three times the line voltage, so the same kVA rating produces very different currents across markets. A set built for a 380 V site and re-used on a 480 V site carries the same kVA at a lower current, which changes the cable sizing but not the alternator’s thermal limit.
Cable sizing at this current is a design exercise rather than a table lookup, because voltage drop over a long run and the derating for installation method both bite. Cable sizing before the enquiry prevents the common situation where the set arrives and the cable cannot carry it. Tesla Power Equipment issues the terminal arrangement and the current rating with the drawing set.
What happens when the load power factor is poor?
A poor load power factor uses up alternator capacity without producing useful work, so the set reaches its current limit before it reaches its kW limit. The symptoms are a set that runs hot at what looks like a modest load.
Welding equipment, induction motors at part load, rectifier banks and large uninterruptible power supplies all depress the power factor. The alternator has to supply the magnetising current as well as the working current, and that magnetising current heats the windings without turning into output.
Two remedies exist for a depressed power factor: specify the alternator with headroom for the reactive load, or correct the power factor at the load with capacitors or an active filter. The first is a capital cost at the set, the second is a cost at the distribution board, and the cheaper option depends on the load mix. Tesla Power reviews the load list for reactive content before fixing the alternator frame, and alternator selection for motor starting loads covers the same trade-off from the starting-current side.
Which sites specify in kVA?
Sites that specify in kVA are usually those where the distribution is designed by an electrical engineer: data centres, hospitals, telecom facilities and industrial plants with their own substations. Domestic and small commercial buyers usually specify in kW.
The kVA convention survives in engineering practice because it maps directly onto switchgear ratings, transformer ratings and cable capacities, all of which are current-limited. The rating classes behind those figures are defined in ISO 8528-1, which is the reference to quote when a tender asks for declared power under stated conditions. A facility engineer sizing a generator against an existing 1250 kVA transformer will naturally specify the set in the same unit.
Tesla Power supplies this class to all four application types, and the differences between them sit in the alternator, the protection settings and the enclosure rather than in the engine block. Where the installation protects life-safety loads, NFPA 110 adds the class and testing expectations, and a large-frame generator set on the same platform covers the next rating step. A hospital and a data centre at the same kVA rating are different machines in everything except the frame size.
What alternator and controller come with it?
The set comes with a brushless alternator of the appropriate frame and a digital controller that handles start, stop, protection and load management. The alternator’s short-circuit capability and its reactances decide how the set behaves on a motor start; the controller decides how it behaves on a mains failure.
Alternator efficiency in this class is typically around 94%, which means a few percent of the input power leaves as heat and has to be removed by the cooling system. Efficiency is not the property that decides whether a site works, though: the step-load behaviour is, and that is set by the alternator’s design rather than by its nameplate efficiency.
The controller should record events and expose the parameters a technician needs, and it should support the transfer scheme the site actually uses. Tesla Power specifies the controller with the control panel checks for remote monitoring in view, since a set this size on an unmanned site is usually monitored rather than attended.
What enclosure and tank options exist?
At this rating the enclosure is normally a container or a heavy skid canopy, with the radiator either container-mounted or remote. The fuel tank is usually a day tank inside the enclosure fed from a bulk tank on site.
A containerised industrial generator set gives the set weather protection, acoustic attenuation and a controlled airflow path, and it becomes a structure for code purposes, which means access doors, louvres and fire separation have to be designed. A skid canopy is cheaper but leaves less room for service and offers less acoustic performance.
Tank arrangements follow the same logic. A base tank at this rating holds hours rather than days of fuel, so the site needs a bulk supply and a transfer pump. Tesla Power Equipment specifies the enclosure, the day tank and the bunding together, because a fuel leak at this volume is an environmental incident rather than a spill.
What documents should accompany it?
The document set should include the rated power table with the power factor and conditions, the dimension and weight drawing, the wiring diagram, the protection settings, the factory test record and the commissioning load test results.
The power table is the item that settles the kVA question, because it states the apparent power, the real power and the power factor at which both hold. Without it, a buyer comparing two offers has no way to tell whether the ratings describe the same conditions.
The commissioning record is the item that proves the installation. A load bank test at stepped load, with voltage dip and recovery time recorded, is the only evidence that the set carries its rating on that site. Tesla Power includes both documents in the handover pack.
Frequently asked questions
How many kW is a 1250 kVA generator?
A 1250 kVA generator delivers 1000 kW at 0.8 pf, the convention used for generator sizing. If the site load runs at a lower power factor, the usable kW is lower for the same kVA, so the power factor of the major loads should be checked before the rating is fixed.
What is the difference between kVA and kW?
kVA is apparent power, which is what the alternator, cables and breaker must carry; kW is real power, which is what the load converts into work. The ratio between them is the power factor, conventionally 0.8 for generator sizing.
What current does a 1250 kVA set deliver?
About 1,800 A per phase at 400 V and about 1,500 A at 480 V, calculated as apparent power divided by the square root of three times the line voltage. Cable and breaker sizing follow that current with the derating factors the installation code requires.
Can the set carry a lower power factor load?
It can carry a lower power factor load, but the usable kW falls in proportion. A site running at 0.7 pf gets less real power from the same alternator, and the windings run hotter for the same output, so either the alternator needs headroom or the power factor needs correcting at the load.
Is a kVA rating better than a kW rating?
Neither is better; they answer different questions. The kVA rating tells an electrical engineer how much current the machine can supply, and the kW rating tells an operator how much work it can do. A complete specification states both with the power factor.
What voltage options are available?
Low-voltage three-phase outputs such as 380 V, 400 V, 415 V and 480 V are common, and the winding is selected for the destination market. Medium-voltage arrangements are a separate design and should be raised at the enquiry stage rather than after the order.
Does the set meet emission requirements?
Emission compliance depends on the engine variant ordered for the destination market, and it is stated as a requirement rather than as a property of the model. Buyers should name the destination country and ask which variant is proposed.
Write the enquiry in kVA and kW with the power factor stated, confirm the current at the site voltage, and check the alternator against the largest motor. Tesla Power builds this class on Cummins platforms, and buyers can compare it against the industrial standby range.