Quick Answer: A set in the one-megavolt-ampere band is chosen by three figures that must agree: apparent power in kVA, real power in kW at the site power factor, and the duty class the annual hours justify. Tesla Power fixes those three first, then the cooling, enclosure and fuel autonomy that decide whether the machine holds its rating in service.

  • Fix the rating from a load log, not from a connected-load total.
  • Confirm the duty class against the hours the site will run.
  • Check the cooling package against the plant room or site ambient.
  • Agree the fuel autonomy and the delivery route before ordering the tank.

What this band of set is for

Machines in this class carry a whole building, a production line or a cooling plant rather than a single load. Typical duties include a hospital block with chillers and lifts, a factory with machine tools and compressed air, a data hall with its cooling, a water treatment works with large pumps, and a commercial tower running as a standby supply.

What those duties share is a load that steps rather than ramps. A hospital brings chillers online in sequence, a factory starts motors against a running bus, and a data hall transfers a block of IT load at once. The set has to hold voltage and frequency through each step, and that is a system question rather than a nameplate question.

The other shared feature is consequence. A set of this size that fails takes a building down, so redundancy, transfer philosophy and test regime belong in the same conversation as the rating. Those three belong on the offer rather than in a separate proposal. Tesla Power reviews those three before the frame is fixed, because a larger set does not compensate for a transfer scheme that cannot carry the load.

The ratings inside this band

Four rating steps cover most of the demand in this class, and the table places them side by side so a buyer can see which step matches a measured peak. Figures are typical for this catalogue rather than universal.

Apparent power Real power at 0.8 pf Site peak it suits Packaging normally offered
800 kVA 640 kW at 0.8 pf Around 500 kW measured Open frame or canopy, plant room
1000 kVA 800 kW at 0.8 pf Around 640 kW measured Container, trailer or plant room
1250 kVA 1000 kW at 0.8 pf Around 800 kW measured Container, project switchgear
1500 kVA 1200 kW at 0.8 pf Around 960 kW measured Container, project switchgear

The peak column assumes the usual 20 to 30 percent headroom above measured demand. It is a starting point rather than an answer, because a site with a large motor load needs a starting study before the step is chosen; the capacity may exist while the voltage dip does not.

Reading the nameplate without being misled

Three numbers describe the same machine and each sizes a different part of the installation. Apparent power in kVA sizes the alternator, the breaker, the busbar and the cable. Real power in kW sizes the engine, the fuel system and the cooling package. The duty class decides how long either figure may be held.

The conversion between the first two is the power factor, normally 0.8 for this class, so 1000 kVA becomes 800 kW at 0.8 pf. A site whose natural power factor is lower reaches the alternator’s current limit before the engine’s kW limit, and correction equipment is often cheaper than the next frame up.

The duty class is the number most often left vague. Those three classes come from ISO 8528-1, whose rating definitions are the wording an export contract usually quotes. Standby applies to a set that carries a site through an outage; prime applies to a set that works for a living; continuous sits below prime with no overload allowance.

Load types and the starting problem

Steady demand is the easy half of sizing. The half that decides whether a set holds is the starting current of the largest motor, because a direct-on-line start draws five to seven times rated current for a few seconds and pulls the bus voltage down with it.

Chillers, compressors and pumps are the usual causes. A set carrying 600 kW that then starts a 200 kW motor may dip further than the site’s drives will tolerate, even though the capacity exists on paper. Soft starters, variable-speed drives and start sequencing all solve it more cheaply than the next frame up, and all three must be specified before the switchboard is built.

The 50 Hz prime duty RFQ checks for factory projects list the load information worth collecting, including the motor schedule and the starting method for each significant load. Tesla Power reads that schedule against the alternator’s transient capability rather than against the steady rating alone.

Cooling, ambient and altitude

The published rating assumes a reference condition, and every degree above it removes capacity. A set installed in a plant room that reaches 45 degrees Celsius in summer is not delivering its nameplate figure in summer, and the correction comes from the engine manufacturer’s derating curve for that model.

Altitude works through a different mechanism with a similar result: thinner air means less oxygen per stroke, so the engine derates to protect its exhaust temperature. Sites above roughly 1,000 m should expect a re-rated offer rather than a footnote, and the altitude and temperature derating checks walk through the correction against a site survey.

The cooling package is where a low offer usually saves money. A radiator sized for a 25 degree test bed will derate a set installed at 45 degrees, and the failure mode is a derate or a shutdown at the hour the site needs power most. Ask for the radiator rating at the site ambient in writing, and Yangzhou Tesla Power states it as a figure rather than as a promise.

Enclosure, container and noise

An open set radiates up to 85 dB(A) at 7 m and a silenced canopy or container can bring that to about 65 dB(A) at the same distance. The measurement distance belongs beside the figure, because the same machine reads far higher at one metre.

Where the set stands decides the enclosure. An indoor installation needs combustion air, cooling air, an exhaust route and a foundation, and a canopy inside a room usually makes the thermal problem worse. An outdoor container needs louvre area for both air paths and a service access route a technician can use in bad weather. The team at Tesla Power Equipment reviews the container drawing against those two points before it is released.

The soundproof canopy checks for factory and hospital sites list the ventilation and access points most often missed. Where the installation supports a life-safety function, NFPA 110 sets the class and test regime for the system, including the transfer equipment. and the EU outdoor noise directive is the usual starting point for a site inside a residential zone in Europe.

Fuel storage and the delivery plan

The integrated tank carries 8 to 10 hours at full load, which at this size is a large volume and a delivery to arrange rather than assume. A site expecting days without a delivery needs a bulk tank with bunding, a transfer pump and a level alarm, and that tank takes its own place in the layout.

Storage discipline matters because the volume makes contamination expensive. Water settles, microbial growth forms at the fuel-water interface, and a tank kept half full for a season delivers all of it to the filters during the first long outage. The fuel polishing and storage checks for standby sites cover sampling, settling and polishing, and they cost far less than the injectors they protect.

Refuelling access is the item most often discovered late. A tank that holds the right volume but sits behind a locked gate with no tanker route has solved the wrong problem, and on a remote site the delivery interval is part of the autonomy calculation rather than an afterthought.

Documents and factory tests

Five documents separate a firm offer from a hopeful one on a set of this size: the rated power table with standby and prime separated, the dimension and weight drawing, the wiring diagram and transfer scope, the alternator test sheet, and the factory test record with the packing list.

The test record is the one that answers the question a brochure cannot: was the machine run at load before it was packed. A set tested at no load has proved that it starts; a set tested at load has proved that it cools, that the governor holds frequency under a step, and that the protections trip where they should. The load bank testing checks at handover describe what a witnessed test should include.

The spare parts and maintenance document checks list what should travel with an export shipment, where an overnight filter delivery does not exist. Tesla Power Equipment ships the parts list and the maintenance schedule with the set rather than on request.

The first five years of maintenance

Service falls at 250 to 500 running hours or every six months, whichever comes first, covering oil and filters, coolant condition, belt and tensioner inspection, battery and charger, and intake restriction. On a standby set the calendar interval governs; on a prime-duty site the hour interval does, and the window has to be agreed with production.

Two annual items sit on top of that schedule. A load test proves the set still carries its block after a year of light duty, and a coolant and fuel sample catches the two failure modes that idle running hides. The unit warranty runs 12 months or 1,000 running hours, whichever comes first, with the engine covered separately by its manufacturer for up to 24 months, and the service record is what makes a claim straightforward.

Two packaging references on the same electrical class make the choice concrete: the 880 kW factory backup package for a site that may relocate, and the 800 kW silenced unit for a fixed installation with a noise limit. Yangzhou Tesla Power quotes both with the same documentation pack and the same test scope.

Frequently asked questions

How do I choose between the steps in this band?

From a logged peak rather than a connected-load total, with 20 to 30 percent headroom and a check on the largest motor start. A site peaking around 640 kW belongs at 1000 kVA at 0.8 pf; one peaking around 500 kW belongs one step down and runs more efficiently there.

Is a higher kVA always the safer choice?

No. A set run below roughly 30 percent of its rating suffers wet stacking and glazed liners, and it burns more per kilowatt-hour than a correctly sized machine. Oversizing trades fuel and engine life for a comfort that the load survey rarely justifies.

What power factor should I assume?

0.8 is the normal convention for this class and the basis on which ratings are usually quoted. A site with a lower measured factor needs correction or a larger alternator, because the current limit arrives before the kW limit does.

Can the set run on both 50 Hz and 60 Hz?

The same frame is built for either, and the choice is fixed at the order because it changes the engine speed and the alternator winding. A 50 Hz set runs at 1,500 rpm and a 60 Hz set at 1,800 rpm, so the acoustic and service picture differs.

What noise level is realistic outdoors?

About 65 to 70 dB(A) at 7 m from a silenced container, and up to 85 dB(A) at the same distance from an open set. Boundary limits are set locally, so the target should come from the site’s permit rather than from a product page.

How much fuel autonomy is normal?

Eight to ten hours from the integrated base tank at full load. Anything longer needs a bulk or day tank, sized against the outage plan and the delivery interval the site can actually rely on.

The rating is the entry point, not the decision. What a site lives with is the cooling margin, the transfer scheme, the fuel autonomy and the test that proved the machine before shipment, and each of those is settled while the order is open. Tesla Power quotes the four together so a buyer compares systems rather than numbers.