Quick Answer: A 1000 kVA Cummins generator delivers 800 kW at 0.8 pf, which is enough to carry a mid-size factory, a hospital block or a data hall through an outage. Tesla Power fixes the frame first and then tests whether one set carries the whole load or two should share it.
- State the maximum demand in kW and the largest motor that starts against it.
- Decide single-set or paralleled before the switchgear is designed.
- Check the transport route against the packaged weight and footprint.
- Size the fuel storage for the outage length the site actually plans for.
What 1000 kVA delivers once the power factor is applied
Apparent power of 1000 kVA becomes 800 kW of real power at 0.8 pf, and the two figures answer different questions. The apparent figure sizes the alternator, the breaker, the busbar and the cable. The 800 kW of real power at 0.8 pf sets the engine fuel map and the heat the cooling package has to reject. A site that plans against the kVA number alone will eventually overload the engine while believing it has capacity in hand.
Reactive load is what separates the two. Motors, transformers, induction furnaces and any equipment with a magnetic circuit draw current that does work in neither the shaft nor the resistor, and that current still heats the alternator winding. A site with a poor natural power factor may see the alternator reach its current limit before the engine reaches its kW limit, which is why correction equipment sometimes costs less than the next frame up.
For this class the working allowance is 20 to 30 percent above the calculated maximum demand, so a set rated 800 kW sits comfortably on a site whose measured peak is around 640 kW. Tesla Power states both figures with the duty rating beside them rather than leaving the buyer to divide.
Frame figures for this rating
The mechanical and electrical package repeats across builds of this class, and the numbers below are the ones that travel onto the foundation drawing and the maintenance schedule.
| Item | Figure | Condition or note |
|---|---|---|
| Apparent power | 1000 kVA | Sizes alternator, breaker and cable |
| Real power | 800 kW at 0.8 pf | Sets the engine load and fuel map |
| Engine | Cummins four-stroke, water-cooled, direct injection | Model code printed on the offer |
| Alternator | Brushless, self-excited | 94 percent efficiency at rated load |
| Controller | DeepSea or Smartgen, LCD panel | Paralleling option needs a different panel |
| Voltage | 220 V, 380 V, 400 V, 415 V | Chosen at the winding stage |
| Frequency | 50 Hz or 60 Hz | Decides engine speed |
| Fuel autonomy | 8 to 10 hours at full load | Standard integrated tank |
| Sound pressure | 65 to 85 dB(A) at 7 m | Container or canopy models at the lower end |
| Service interval | 250 to 500 running hours or six months | Whichever comes first |
| Operating range | Minus 30 to plus 50 degrees Celsius | Derating applies outside the test condition |
| Warranty | 12 months or 1,000 running hours | Engine covered separately by its manufacturer |
Dimensions and weight are deliberately absent from that table. On a set of this size they vary by several hundred millimetres and by more than a tonne depending on the enclosure, the tank and the silencer package, so Yangzhou Tesla Power issues them on the outline drawing rather than on a page like this one.
Standby, prime and the third category buyers forget
ISO 8528-1 separates the ratings a set may be sold under, and the ISO 8528-1 rating definitions are the wording an export contract usually cites. Standby power is the figure available during a utility outage with a limited annual hour allowance; prime power is the figure available continuously with a defined overload; continuous power is a lower figure again, with no overload allowance at all.
The trap sits between prime and continuous. A site that runs a set as its only supply, year round, at a steady load, belongs in the continuous column, and buying a prime-rated machine for that duty quietly consumes the overload margin the rating was meant to preserve. Sites that run prime duty but only during working hours can usually stay in the prime column, because the set still rests overnight and at weekends.
How to tell which column applies
The annual running hours and the pattern of the load answer it. Below roughly 500 hours a year against a working utility supply, standby applies. Between 500 and 4,000 hours, prime applies. Above that, or where the set never rests, continuous applies. Tesla Power asks for the hour figure and the daily pattern before the rating is written into the offer.
What actually draws 800 kW
An 800 kW block covers a mid-size manufacturing plant with machine tools and compressed air, a hospital with chillers and lifts, a data hall with IT load and cooling, or a water treatment works with large pumps. Each of those loads behaves differently when the set picks it up, and the difference decides whether the set holds.
Chillers and compressors bring motor inrush. Lifts bring regenerative energy on descent. IT load brings a power factor close to unity and a load that steps rather than ramps. Pumps bring the highest starting current of the four when they start against a closed valve and the lowest when they start against an open one. A site survey that lists kW alone will miss all of it, which is why Tesla Power Equipment asks for the motor schedule and the load steps together.
The transfer arrangement carries the same weight as the rating on a critical site. The ATS planning notes for data center generators cover transfer time, switching poles and the neutral arrangement, and those three items decide whether the load rides through the transition or restarts.
One large set or two smaller ones in parallel
Two paralleled sets cost more in switchgear and controls than one set of the same total capacity, and they buy three things in return: redundancy, part-load efficiency across a varying load, and a transport package that fits where a single large set would not. A site that cannot tolerate a single failure needs the redundancy; a site with a load that swings between a third and full capacity benefits from running one set at a time.
Paralleling also introduces failure modes that a single set does not have. Load sharing between machines, reverse power protection, synchronising checks and a master controller that survives the loss of one unit all have to be specified, tested and maintained. The planning notes for parallel generator sets in a factory expansion set out the sequence a site should follow.
Where the plant may later connect to the utility in parallel rather than only island from it, the protection and approval requirements change again, and the utility parallel and export operation checks are the right starting point before any equipment is ordered.
Packaging, transport and the route to site
A set of this class normally travels in a container or on a flat rack, and the packaged dimensions rather than the bare dimensions decide whether the route works. Low bridges, narrow village roads, ferry ramps and crane capacity at the receiving end are all constraints that a drawing review catches for free and a shipping delay does not.
The flat rack and out-of-gauge shipping limits explain when a package stops being a standard container load, and the containerized procurement notes for remote sites cover the access, ventilation and lifting arrangements that a container package adds.
Container packaging also changes the acoustic and thermal picture. A container with the wrong louvre area will derate the set long before the engine reaches its limit, and a container with the wrong door arrangement will make every future service visit slower than it needs to be. Tesla Power Equipment fixes the container layout against the site survey rather than against a standard drawing.
Fuel storage on a set that drinks this much
The integrated tank covers 8 to 10 hours at full load, which on an 800 kW set is a large volume of diesel and a delivery that has to be planned. A site that expects multi-day outages needs a bulk tank with its own bund, transfer pump and level alarm, and the tank becomes a separate item in the site layout rather than an accessory to the set.
Storage discipline matters at this scale because the volume makes contamination expensive. Water settles, biology grows at the fuel-water interface, and a tank that sits half full for a year will deliver its contamination to the filters at the worst possible moment. Sampling from the bottom, polishing on a schedule and keeping the tank full are the three habits that keep a large set reliable, and Tesla Power writes them into the handover pack.
Maintenance on a machine of this size
Service falls at 250 to 500 running hours or six months, covering oil and filters, coolant condition, belt and tensioner inspection, battery and charger, and intake restriction. On a prime-duty set those hours arrive within weeks, so the schedule needs a maintenance window agreed with production rather than a reminder on a calendar.
An annual load test proves the set still carries its block after a year of light duty, and it is the only test that reveals a cooling or fuel problem that idle running hides. The diesel generator maintenance checklist is a workable basis for the record, which is also what a warranty claim depends on.
A buyer who wants the same block in a smaller package can review the 1000 kW mobile trailer set for the transport arrangement, while the 880 kW factory backup unit shows the next frame down with the same container and trailer options.
Frequently asked questions
How many kW is 1000 kVA?
800 kW at 0.8 pf. The conversion is apparent power multiplied by the power factor, and the result is the real power the engine has to produce. A site with a power factor below 0.8 gets fewer kW from the same kVA.
Can one 1000 kVA set carry a whole factory?
It can carry a mid-size plant whose measured peak sits around 640 kW with headroom, which covers many machine shops and light assembly plants. Heavier plants with large motor loads usually need a load study before the answer is known.
What is the difference between this set and two 500 kVA sets?
Two smaller sets in parallel add redundancy and part-load efficiency at the cost of switchgear, controls and a more demanding test regime. One larger set is simpler to run and cheaper to install, but a single failure takes the whole load down.
Does the set need a separate fuel tank?
Not for an outage of a working day. Beyond that, a bulk tank with bunding and a transfer arrangement is normal, and on a critical site the tank volume is set by the autonomy the operator has committed to rather than by the standard base tank.
Which standard covers the transfer equipment?
Where the installation is a life-safety standby system, NFPA 110 sets the class, the testing regime and the fuel requirements, and it treats the transfer switch as part of the system rather than as an accessory.
How often should the set be load tested?
An annual test at load is the common minimum for a standby set, with a monthly no-load run to confirm starting and to circulate oil. Sites with a life-safety duty follow the schedule their standard imposes rather than a generic interval.
Choosing this class comes down to four numbers: the apparent power the alternator must carry, the real power the engine must produce, the duty rating the hours justify, and the headroom the load survey recommends. Once those four agree, the packaging and the fuel arrangement follow the site rather than the catalogue. Tesla Power issues the offer with the four figures on one sheet so the comparison stays on the engineering instead of the headline.