A 100 kVA Cummins generator delivers 80 kW of real power at 0.8 power factor, which covers a shop’s lighting, refrigeration and tills, a clinic’s essential circuits, or a small office block. This size is right when the essential load is small and clearly separable, and wrong when the load is undefined and growing. Sets in this band are built on a four- or six-cylinder Cummins block, water-cooled and direct injection, running at a standard speed. A 100 kVA set is normally three-phase, but small sites often have single-phase equipment, so the winding has to match. The article covers the engine and alternator, the single-phase and three-phase choice, the enclosure and transfer options, the values that belong on the offer, the sizing that starts from a measured load, and the maintenance that keeps a small standby set ready. The article also explains how to read the quotation line by line, why the winding arrangement matters more than the headline figure, and how the measured load decides the enclosure.
- Measure the essential load before choosing this step.
- Decide single phase or three phase by the equipment, not the price.
- Confirm 50 Hz or 60 Hz before the winding is fixed.
- Ask whether the transfer is automatic or manual.
What this rating carries
At 0.8 pf the set delivers 80 kW of real power, which covers a shop’s lighting, refrigeration and tills, a clinic’s essential circuits, a small hotel’s pumps and lighting, or a telecom cabinet with its cooling. The load is usually mixed, with a few motors and a large block of electronics, and that mix is what makes the apparent rating matter as much as the real one.
A load with motors draws more current for the same kW, so the alternator is asked for more than the arithmetic suggests. A 60 kW connected load with two refrigeration compressors can sit closer to the apparent limit than a 70 kW load of lighting and heaters, and the difference shows up at the moment a compressor starts.
Tesla Power asks for the load list with the starting method of every motor, because at this rating a single oversized compressor can decide the frame.
When this size is right, and when it is not
This step is right when the essential load is small and clearly separable: a defined block of circuits that must stay live, with the rest of the building allowed to go dark. It is wrong when the site expects the whole building to run as normal, because the air conditioning and the kitchen alone will exceed it.
The second case where this size is wrong is a site that plans to grow. A set chosen at the top of its range has no room for the next machine, and stepping up later costs more than buying the next frame now. The middle case, where the load is between this step and the next one, is usually resolved by asking what the site will look like in three years.
Tesla Power Equipment asks that question before quoting, because the honest answer sometimes moves the enquiry up a frame rather than down.
Engine and alternator at this size
Sets in this band are built on a four- or six-cylinder Cummins block, water-cooled and direct injection, running well below the block’s ceiling. The reserve is what makes a small set behave well on a motor start: the engine holds speed while the alternator absorbs the current, and the recovery is short enough that equipment does not reset.
The alternator is a brushless, self-excited machine at around 94% efficiency. At this rating the frame choice is narrow, but it still matters: a set with a smaller frame will dip further on a compressor start, and the dip is what trips a chiller’s control board.
Tesla Power names the engine variant and the alternator frame on the offer, so the two halves of a small machine can still be checked rather than assumed.
Single phase or three phase
A 100 kVA set is normally three-phase, but small sites often have single-phase equipment, and the winding has to match. A three-phase set can supply single-phase circuits if the load is balanced across phases, and an unbalanced board is the most common reason a small set trips on one phase while the others are lightly loaded.
The practical rule is to list the equipment first and the phases second: motors above a few kW, air handling units and pumps are usually three-phase, while lighting, sockets and small appliances are not. The balance across phases then decides whether the set needs a larger frame than the total suggests.
The load profile checks for mixed facility loads show how to build that list, and they are the reason a quotation should ask for it rather than accept a total.
Enclosure: canopy, open frame or trailer
At this size the enclosure is often the largest single line in the price, and it decides where the set can live. A silent canopy brings the level down to about 65 dB(A) at 7 m, an open frame reaches roughly 85 dB(A), and a trailer adds mobility at the cost of some acoustic performance.
Sound attenuation and airflow fight each other inside a canopy, which is why both are quoted as one design. The silent generator noise level guide explains why a level without a measuring distance cannot be compared with a boundary limit, and it is the figure a planning condition is usually written against.
Tesla Power quotes the noise level with its measuring distance and the enclosure type, so two offers can be compared without guessing which measurement each one used.
Automatic or manual transfer
A standby set is only useful if the load reaches it. An automatic transfer switch starts the set and moves the load within a defined time; a manual changeover depends on someone being on site, which is acceptable for a workshop and not for a clinic.
The choice also decides the panel: an ATS-ready controller has the start contacts and the mains sensing built in, while a manual arrangement needs only a terminal box and a changeover switch. The ATS transfer time and pole checks set out how the window is specified and why the neutral arrangement matters as much as the timing.
Values that belong on the offer
Each row below is a question to put to a supplier before the comparison starts.
| Item | What the offer should state | What it decides |
|---|---|---|
| Rated output | Standby and prime separated, with the kW figure at 0.8 pf | Alternator frame, breaker and cable size |
| Voltage | 220 V, 380 V, 400 V or 415 V, wound to the site | Fixed at the winding stage |
| Frequency | 50 Hz or 60 Hz | Engine speed and connected equipment |
| Engine | Cummins variant named, four-stroke, water-cooled, direct injection | Parts, intervals and emission configuration |
| Alternator | Brushless, self-excited, around 94% efficiency, frame named | Voltage dip on a motor start |
| Controller | DeepSea or Smartgen panel with LCD and alarm contacts | Remote start and fault reporting |
| Fuel tank | Integrated, 8 to 10 hours at full load | Refuelling interval and bunding |
| Noise | From 65 dB(A) at 7 m in a canopy, up to 85 dB(A) on an open frame | Whether the set can sit near a boundary |
| Transfer | ATS rating and transfer time, or a manual changeover scope | Whether the load moves without an operator |
Sizing a small standby set
Sizing starts from the circuits that must stay live, measured rather than estimated. A clamp meter on the essential board for a week gives the peak; the motor list gives the start that the alternator has to survive.
Add roughly a quarter to a third above the measured peak as margin. A site that measures 60 kW fits this step comfortably; a site that measures 72 kW with a large compressor should look at the next frame, because the starting current will not fit the smaller alternator.
Frequency matters here too. A set built for 50 Hz cannot be re-rated to 60 Hz on site, and the choice changes the engine speed and the winding. The 50 Hz versus 60 Hz selection guide covers the cases where the destination’s supply decides the order.
Fuel and maintenance on a small frame
A full tank keeps the set running for most of a working day at rated load, and well beyond that at part load, which suits a site with fuel delivered on a schedule. A small tank is more sensitive to contamination than a large one, because the filter is smaller and clogs sooner.
Servicing falls due at 250 to 500 running hours or at six months, whichever arrives first: engine oil and filters, coolant strength, belt condition, battery and charger, and air intake restriction. The diesel generator maintenance checklist turns that into a schedule a site team can keep without a specialist.
On this frame the unit carries 12 months or 1,000 running hours, whichever comes first, and the engine up to 24 months from its manufacturer. Tesla Power ships the interval sheet with the set so the record starts with the machine rather than after the first fault.
Two frames either side
The comparison that matters at this size is with the step above, because the price difference is smaller than the cost of being short on a hot afternoon. The standby set for industrial and portable duty shows the package at this rating.
The trailer and container frame one step up is the usual answer when the load list includes a second compressor or a small chiller. The alternator frame is listed against both, so the buyer can see what the extra step buys in starting capacity rather than in headline numbers.
Frequently asked questions
How much real power does a 100 kVA set deliver?
About 80 kW at 0.8 pf. Where the power factor falls below 0.8, the same real load needs more current, and the apparent rating becomes the binding limit.
Can it run a house or a small hotel?
It runs the essential circuits of a small hotel: lighting, pumps, refrigeration and the reception area. A whole house with electric heating and air conditioning usually exceeds it, so the essential block has to be defined first.
Is a single-phase version available?
Small sets can be wound for single phase, and the choice is fixed at order. Most sites at this rating take three phase and balance the single-phase circuits across the phases.
What transfer switch suits it?
An automatic transfer switch rated for the full load current, with the pole count the installation requires. Tesla Power Equipment quotes the ATS and the set together, because a transfer that arrives separately is where commissioning weeks are lost. A manual changeover is acceptable where someone is always on site, and unsuitable where the load must recover unattended.
How much fuel does it use?
The figure follows the load and should be quoted at 50, 75 and 100 percent rather than as one number. The integrated tank covers roughly 8 to 10 hours at full load.
Which standards apply?
ISO 8528 defines the set and its ratings. An emergency system is classed and tested against NFPA 110, and engine emissions for a United States project against the EPA engine standards.
A set at this rating is decided by three choices rather than by the engine: the winding and frequency, the enclosure and the transfer arrangement. Fix those against a measured essential load, then compare the offers on the same lines. Tesla Power quotes to that brief and states the test record that proves the result.